Table of Contents
1 Table of contents
1 Table of contents 2
1.1 List of Tables 4
1.2 List of Figures 4
2 Introduction 5
2.1 GlobalData Report Guidance 6
3 Business Propensity Indicator Methodology 7
3.1 Methodology Adopted For Evaluating the Business Propensity Indicator for the Asia Pacific region 7
3.1.1 Capacity and Reserve Potential 7
3.1.2 Regulatory Scenario 8
3.1.3 Investment Scenario 8
3.1.4 Transmission and Distribution (T&D) Infrastructure 10
3.1.5 Macro Economic Scenario 11
3.1.6 Competitive Scenario 12
3.2 Methodology Adopted to Arrive at a Final Rank 13
4 Power Market, Signapore, Business Propensity Indicator 15
4.1 Capacity and Reserve Potential 16
4.2 Regulatory Scenario 16
4.3 Investment Scenario 16
4.4 Transmission and Distribution Infrastructure 17
4.5 Macroeconomic Factors 17
4.6 Competitive Scenario 18
4.7 Conclusion 18
4.8 Business Propensity Indicator Ranking 19
4.8.1 Present Ranking 19
4.8.2 Future Ranking 19
5 Singapore Power Market Analysis, 2000–2030 20
5.1 Demand and Consumption Scenario 20
5.2 Annual Power Consumption (GWh), 2000–2030 21
5.3 Cumulative Installed Capacity, 2000–2030 23
5.3.1 Cumulative Installed Capacity by Type of Power Plant: Percentage, 2010 23
5.3.2 Cumulative Installed Capacity: Total Value, 2000–2030 24
5.3.3 Cumulative Renewable Installed Capacity, 2000–2030 26
5.4 Power Generation, 2000–2030 27
6 Power Market, Singapore, Top 10 Active and Upcoming Projects 30
6.1 Active Power Projects 30
6.1.1 Top 10 Active Thermal Power Projects 30
6.2 Upcoming Power Projects 31
6.2.1 Top 10 Upcoming Thermal Power Projects 31
6.2.2 Top Upcoming Renewable Power Projects 32
7 Power Market, Singapore, Regulatory Structure 33
7.1 Singapore, Power Market, Regulatory Structure Overview 33
7.1.1 Liberalization of the Electricity Market 33
7.1.2 Renewable Energy Development 34
7.1.3 Energy Efficiency 35
8 Power Market, Singapore, Infrastructure 36
8.1 Infrastructure Overview 36
8.1.1 Grid Development 36
8.1.2 Smart Grid Deployment 37
8.1.3 Distribution Overview 37
9 Power Market, Singapore, Competitive Landscape: Snapshot of Top Three Power Companies 38
9.1 Market Share of Major Power Generating Companies 38
9.2 Key Company in Singapore’s Power Market, PowerSeraya Limited 39
9.2.1 PowerSeraya Limited, Company Overview 39
9.2.2 PowerSeraya Limited, Business Description 39
9.2.3 PowerSeraya Limited, SWOT Analysis 40
9.3 Key Company in Singapore’s Power Market, Tuas Power Ltd 42
9.3.1 Tuas Power Ltd, Company Overview 42
9.3.2 Tuas Power Ltd, Business Description 42
9.3.3 Tuas Power Ltd, SWOT Analysis 43
9.4 Key Company in Singapore’s Power Market, Senoko Energy Pte Ltd. 46
9.4.1 Senoko Energy Pte Ltd., Company Overview 46
9.4.2 Senoko Energy Pte Ltd., Business Description 46
9.4.3 Senoko Energy Pte Ltd., SWOT Analysis 47
10 Appendix 50
10.1 Market Definitions 50
10.1.1 Power 50
10.1.2 Installed Capacity 50
10.1.3 Active Installed Capacity 50
10.1.4 Electricity Generation 50
10.1.5 Thermal Power 50
10.1.6 Hydro Power 50
10.1.7 Nuclear Power 50
10.1.8 Renewable Energy Resources 50
10.1.9 Generation Company 50
10.1.10 Electricity Consumption 50
10.1.11 Transmission Network 50
10.1.12 Interconnector 50
10.1.13 Transmission and Distribution Loss 51
10.2 Abbreviations 51
10.3 GlobalData’s Methodology 52
10.3.1 Coverage 52
10.3.2 Secondary Research 52
10.3.3 Primary Research 52
10.4 Contact Us 53
10.5 Disclaimer 53
1 Table of contents 2
1.1 List of Tables 4
1.2 List of Figures 4
2 Introduction 5
2.1 GlobalData Report Guidance 6
3 Business Propensity Indicator Methodology 7
3.1 Methodology Adopted For Evaluating the Business Propensity Indicator for the Asia Pacific region 7
3.1.1 Capacity and Reserve Potential 7
3.1.2 Regulatory Scenario 8
3.1.3 Investment Scenario 8
3.1.4 Transmission and Distribution (T&D) Infrastructure 10
3.1.5 Macro Economic Scenario 11
3.1.6 Competitive Scenario 12
3.2 Methodology Adopted to Arrive at a Final Rank 13
4 Power Market, Signapore, Business Propensity Indicator 15
4.1 Capacity and Reserve Potential 16
4.2 Regulatory Scenario 16
4.3 Investment Scenario 16
4.4 Transmission and Distribution Infrastructure 17
4.5 Macroeconomic Factors 17
4.6 Competitive Scenario 18
4.7 Conclusion 18
4.8 Business Propensity Indicator Ranking 19
4.8.1 Present Ranking 19
4.8.2 Future Ranking 19
5 Singapore Power Market Analysis, 2000–2030 20
5.1 Demand and Consumption Scenario 20
5.2 Annual Power Consumption (GWh), 2000–2030 21
5.3 Cumulative Installed Capacity, 2000–2030 23
5.3.1 Cumulative Installed Capacity by Type of Power Plant: Percentage, 2010 23
5.3.2 Cumulative Installed Capacity: Total Value, 2000–2030 24
5.3.3 Cumulative Renewable Installed Capacity, 2000–2030 26
5.4 Power Generation, 2000–2030 27
6 Power Market, Singapore, Top 10 Active and Upcoming Projects 30
6.1 Active Power Projects 30
6.1.1 Top 10 Active Thermal Power Projects 30
6.2 Upcoming Power Projects 31
6.2.1 Top 10 Upcoming Thermal Power Projects 31
6.2.2 Top Upcoming Renewable Power Projects 32
7 Power Market, Singapore, Regulatory Structure 33
7.1 Singapore, Power Market, Regulatory Structure Overview 33
7.1.1 Liberalization of the Electricity Market 33
7.1.2 Renewable Energy Development 34
7.1.3 Energy Efficiency 35
8 Power Market, Singapore, Infrastructure 36
8.1 Infrastructure Overview 36
8.1.1 Grid Development 36
8.1.2 Smart Grid Deployment 37
8.1.3 Distribution Overview 37
9 Power Market, Singapore, Competitive Landscape: Snapshot of Top Three Power Companies 38
9.1 Market Share of Major Power Generating Companies 38
9.2 Key Company in Singapore’s Power Market, PowerSeraya Limited 39
9.2.1 PowerSeraya Limited, Company Overview 39
9.2.2 PowerSeraya Limited, Business Description 39
9.2.3 PowerSeraya Limited, SWOT Analysis 40
9.3 Key Company in Singapore’s Power Market, Tuas Power Ltd 42
9.3.1 Tuas Power Ltd, Company Overview 42
9.3.2 Tuas Power Ltd, Business Description 42
9.3.3 Tuas Power Ltd, SWOT Analysis 43
9.4 Key Company in Singapore’s Power Market, Senoko Energy Pte Ltd. 46
9.4.1 Senoko Energy Pte Ltd., Company Overview 46
9.4.2 Senoko Energy Pte Ltd., Business Description 46
9.4.3 Senoko Energy Pte Ltd., SWOT Analysis 47
10 Appendix 50
10.1 Market Definitions 50
10.1.1 Power 50
10.1.2 Installed Capacity 50
10.1.3 Active Installed Capacity 50
10.1.4 Electricity Generation 50
10.1.5 Thermal Power 50
10.1.6 Hydro Power 50
10.1.7 Nuclear Power 50
10.1.8 Renewable Energy Resources 50
10.1.9 Generation Company 50
10.1.10 Electricity Consumption 50
10.1.11 Transmission Network 50
10.1.12 Interconnector 50
10.1.13 Transmission and Distribution Loss 51
10.2 Abbreviations 51
10.3 GlobalData’s Methodology 52
10.3.1 Coverage 52
10.3.2 Secondary Research 52
10.3.3 Primary Research 52
10.4 Contact Us 53
10.5 Disclaimer 53
...








Loading...